Our Portfolio of Concrete Projects

  • Railex Climate Controlled Food Distribution Facility

    240,000 square feet - high quality reinforced concrete floor system.240,000 square feet - high quality reinforced concrete floor system.

  • British American Building #25

    105,000 square feet - multi-story Class A office facility. Complex multi angle and high wall reinforced cast in place concrete foundation and concrete floor systems.

  • Lowes:

    78,000 square feet of 9 inch thick reinforced exterior concrete paving. Project consisted of a complex multi-contoured site paving project with Class A broom finish

  • Bethlehem Plaza

    140,000 square feet - multi-tenant retail plaza including anchor tenants PetSmart and Staples. Project consisted of reinforced concrete foundation and floor systems.

  • Hudson Preserve Luxury Apartment Complex

    25, 12,000 square feet - fast track reinforced concrete floor systems including associated form work and concrete porches. 14 multi-car garage fast track reinforced concrete floor systems including associated form work.

  • The Dome, Adirondack Sports Complex

    96,000 Square feet - Multi-Sports Facility and a 7900 Square foot Support facility. Major reinforced concrete foundation system including concrete super flat and sloped floor areas.

  • ESMI New Jersey

    34,000 square feet of sloped industrial reinforced concrete floor system.

  • Lake George Waste Water Treatment Expansion

    Complex high wall, gang-formed, cylindrical reinforced concrete tanks. Also included reinforced concrete suspended decks and associated foundations.

  • Bard College, Robinson Hall

    Complex multi angle and curved high wall reinforced cast in place concrete foundation and concrete floor systems.

  • Arrowhead Equipment

    10,000 square feet - corporate headquarters and manufacturing facility expansion; Pre-engineered metal building with masonry and architectural metal panel exterior finish.

  • Super Steel Locomotive Plant

    Paint booth Foundations and associated Structural Rail Work: Fast track plant improvements. Projects consisting of removal of existing floor areas, construction of several complex foundations for locomotive paint booth and interior rail track system, structural steel fabrication and erection of paint booth rail track supports and installation of track rail.

  • Lehigh Northeast Cement Facility

    Fast track, round the clock, shut down plant improvements. Projects consisting of removal and reconstruction of several complex foundation and floor systems with critical path completion times.

  • Cedars Independent Living Facilities, Phases I & II

    Two, 30,000 square foot facilities - foundation and floor system (high gang form walls systems).

  • East Field Plaza

    25,000 square feet - multi-tenant retail plaza, reinforced concrete foundation and floor system.

  • Northeast Orthopedics Medical Office Building – Albany, NY
  • Glens Falls Central Schools

    50,000 sq. ft. Foundation and Floor systems.

  • Hunter Mountain Ski Center

    Major Concrete Foundation and Floor system.

  • Rip Van Dam Hotel

    a five-story new construction office Facility.

  • Schroon Lake Highway Garage

    Concrete Foundation and Floor systems.

  • Champlain Stone, LLC

    3 Buildings, Concrete Foundation and walls